Project Readiness Check
The Readiness Check assesses your BESS project across eight weighted dimensions — from grid connection (25 %) through land and permitting, technical configuration and economics to financing, marketing, delivery and insurance. The result is a score from 0 to 100, a project stage classification and a concrete list of missing building blocks.
The check takes about three minutes and runs entirely in your browser. It honestly shows where your project stands — and what is missing to reach the next readiness level.
How it works
- 01
Enter project basics: application, size, grid status, land, permits, financing.
- 02
Compute the score: eight dimensions are assessed individually and aggregated with weights.
- 03
Get the classification: project stage, missing data, CAPEX indication and typical risks.
Project basics
All inputs are indicative — the more honest, the more reliable the score.
Score your project along the four criteria categories of the German TSOs' maturity procedure (max. 11 points). Minimum requirements must all be met for eligibility; points decide the ranking when a grid node is oversubscribed.
ALand security & permitting status
0 / 3BTechnical plant & connection concept
0 / 3CApplicant capability
0 / 3DGrid & system benefit
0 / 2Methodology and scope
The weighting reflects market practice: grid connection 25 %, land & permitting 15 %, technical 15 %, economics 15 %, financing 10 %, marketing 10 %, delivery 5 %, insurance 5 %. The score is a structured self-assessment and does not replace due diligence.
Next step
Start your project or talk to us — we will connect you with the right contact.