Austria: 24 GW of requests, rules still open.
The new Electricity Industry Act (ElWG) promises system-beneficial storage a 20-year grid-fee exemption. What “system-beneficial” means is still open — and grid capacity is scarce.
As of 01 Oct 2026. Not legal or investment advice. Every figure is sourced below.
> 24 GW
battery connection requests at DSOs [1]
20 years
grid-fee exemption for system-beneficial storage (ElWG) [3]
up to 5 GW
planned scope of the exemption (E-Control) [2]
85 MW / 170 MWh
largest grid-serving BESS (Wagenham, 09/2026) [4]
Rules & status
- ElWG passed
- National Council, 11 Dec 2025, two-thirds majority (part of the “cheaper electricity act”). Many provisions phase in over time. [3]
- Grid-fee exemption
- System-beneficial storage: 20-year exemption from withdrawal-side network use and loss charges. “System-beneficial” is not yet precisely defined — slowing connection procedures. [1]
- Scope (E-Control draft)
- Up to 5 GW: large storage from 1 MW plus aggregators pooling units from 50 kW. Industry asks for grid impact rather than project type as the criterion. [2]
- System charges
- New system charges apply from 31 Dec 2026; the related ordinance (SNE-G-V) is due to enter into force on 1 Jan 2027. [1]
- Grid bottleneck
- Example Carinthia: connection requests ≈ five times the region’s peak load. Requests ≠ built projects. [1]
On our map
Battery storage from OpenStreetMap, updated weekly. OSM is community-mapped and incomplete.
Loading …
View on the map →Timeline
11 Dec 2025
National Council passes ElWG
27 Feb 2026
E-Control: consultation on system charges (SNE-GV part 2)
15 Sept 2026
NGEN commissions 85 MW / 170 MWh in Wagenham
31 Dec 2026
New system charges apply
01 Jan 2027
SNE-G-V ordinance due to enter into force
Sources
- i-Magazin — Anschlussanfragen übersteigen Netzkapazität (> 24 GW) · 24 Sept 2026
- i-Magazin — Netzentgelte für Batteriespeicher: Verband kritisiert geplante Ausnahmen (E-Control, bis 5 GW) · 24 Sept 2026
- WKO — Information zum finalen Elektrizitätswirtschaftsgesetz (ElWG) · 11 Dec 2025
- ESS News — NGEN nimmt 170-MWh-Batteriespeicher in Österreich in Betrieb · 15 Sept 2026
- CMS — Batteriespeicher im künftigen ElWG · 01 Dec 2025
- E-Control — Marktkonsultation SNE-GV Teil 2 · 27 Feb 2026