Tools for your project.
Interactive tools that turn assumptions into sound project decisions.
In the mid-market the decisive factor is usually not technology but the distribution-grid connection — and whether the project pencils out without an analyst team. The tools are ordered the way the questions arise.
Typical: a 6 MW utility battery at its own substation, a 15 MW standalone by a regional developer, an industrial battery at the plant connection.
- Step 01New
Grid & Infrastructure Map
Click a site: nearest substations, storage competition nearby and the responsible grid operator.
- Step 02Deadlines running
Grid connection procedures
Which allocation procedure applies at your DSO — at E.ON already from 300 kW. With deadline countdown and points check.
- Step 03
ROI calculator (mid-market)
Ancillary and arbitrage revenue with live prices, preset to 10 MW / 20 MWh.
- Step 04
BESS configurator
Size power, capacity and technology for your site.
- Step 05
Project readiness check
How far along is the project really — and what is missing before the grid application?
- Step 06
RFQ builder
Get comparable integrator quotes without committing.
- Step 07
Project valuation
What is the project worth in its current phase?
From about 30 MW, structured offtake contracts and institutional finance dominate, and around 100 MW the TSOs' maturity procedure applies. What counts is how robust project maturity and revenue assumptions are.
Typical: 50–300 MW standalone storage, co-location at wind or solar parks, connection at 110 kV and above.
- Step 01New
Grid & Infrastructure Map
Substations and lines from 110 kV, competition within 10/25/50 km — compare and save sites.
- Step 02
ROI calculator (utility-scale)
Revenue stack and sensitivities for large storage, preset to 50 MW.
- Step 03
Maturity check (TSO)
Self-assessment against the four TSOs' maturity procedure criteria.
- Step 04
Grid procedures · transmission
Status, mechanics and open points of the TSO procedure with sources.
- Step 05
Grid connection navigator
Voltage level, operator type and realistic connection timelines.
- Step 06
Project valuation
Valuation per development phase for sale or entry.
- Step 07
RFQ builder
Structured tender to integrators and OEMs.
All tools
Grid & Infrastructure Map
All battery storage ≥ 1 MW with substations and lines from 110 kV. Click a site: grid, competition, grid operator and procedure.
Site ranking A–F
More than 10,000 substations in DE, AT, FR (from 63 kV) and IT by screening priority — grid, competition, generation, PV, brownfield. With site alerts.
Co-location target list
About 8,400 PV sites from 1 MW without known storage in Germany and France — scored by size, grid proximity and competition, with data quality per attribute.
BESS Configurator
Size your storage: power, capacity, technology and components.
ROI Calculator
Calculate the economics of your project based on current market assumptions.
Grid Connection Navigator
Check grid connection options for your site.
Grid Connection Procedures
Which allocation procedure applies at your grid operator? Deadline countdown, points check and calendar export.
Project Readiness Check
Find out how far your project really is — and what is missing for the next level.
RFQ Builder
Create structured requests to suppliers and receive comparable offers.
Project Valuation
Estimate the value of your project in its current phase.
Next step
Start your project or talk to us — we will connect you with the right contact.