Every battery storage unit from 1 MW in Germany, plus the high- and medium-voltage grid, 110 kV/MV substations, power plants and former power plant sites. Click a potential site — Site Intelligence shows the nearest connection points, storage competition, generation nearby, the responsible grid operator with its procedure and an indicative screening.

Usable without sign-up Indicative screening Site report & comparison with an account Straight into the ROI calculator

How to use the map

  1. 01

    Search a place

    Enter a municipality, district or address — or zoom into the map.

  2. 02

    Click a site

    Click an empty spot: substations, lines ≥ 110 kV within 5 km, storage within 10/25/50 km, grid operators.

  3. 03

    Run the numbers

    Enter power and capacity and check the economics in the ROI calculator with one click.

  4. 04

    Save, compare, report

    With a free account, save sites with their analysis, compare up to six side by side and create a site report as PDF.

What the map can do — and what not

The map does not replace a grid connection enquiry. Only the grid operator knows whether capacity is available at a substation. It shows where grid and competition are, so you enquire at the right sites first. Grid and power plant data comes from OpenStreetMap (community-mapped; largely complete from 110 kV, patchy in medium voltage); storage data from the Bundesnetzagentur market master data register.

→ Which allocation procedures apply at the grid operators?