„Where and how can my storage be connected?"
Grid connection — the critical path of every BESS project.
The grid connection is the single most important factor for project value — and the most common bottleneck. Knowing the voltage level, grid operator, connection costs and timelines early lets you develop faster and avoid expensive misplanning.
What is included
What is included
- Identification of the responsible grid operator and the appropriate voltage level
- Structuring of the grid connection request: site, power, capacity, charge/discharge power, COD, project type
- Overview of required documents and typical review steps
- Assessment of grid studies, connection costs and timeframes
- Status tracking of the grid connection as a dedicated project milestone
- Access to grid planners and specialised engineering firms
The process
The process
01
Capture site & parameters
Record site data, MW/MWh, charge and discharge power, target COD and known grid parameters.
02
Assess connection options
Derive grid operator, possible voltage level and rough connection costs in a structured way.
03
Prepare the grid application
Compile all required documents and submit a clean application.
04
Secure the confirmation
Accompany the review process, clarify questions and sign the connection agreement.
Check your grid connection
Check the grid connection options for your site — in a structured way, before making expensive planning mistakes.