BESS-Market
Solutions

„Which MW/MWh, technology, PCS and EMS do I need?"

BESS configuration — sizing with substance.

The right configuration determines CAPEX, revenues and bankability. The BESS Configurator combines technical, grid-side and financial parameters — delivering a pre-feasibility assessment instead of rough thumb values.

What is included

What is included

The process

The process

01

Enter the framework

Set country, site, application and grid parameters.

02

Size the system

Choose power, capacity, duration and technology matched to the revenue model.

03

Check the economics

Calculate CAPEX/OPEX against revenue streams — with degradation and scenarios.

04

Receive the assessment

Technical KPIs and financial metrics as a sound decision basis.

Configure your system

The configurator takes less than 10 minutes and delivers a pre-feasibility assessment with concrete metrics.